A wet corner of a field, an overgrown farm pond or a runoff problem can be the starting point for a worthwhile habitat project. For farmers and land managers on Dartmoor, Farming in Protected Landscapes (FiPL) is a funding route worth discussing before deciding what to build.

Dartmoor National Park’s current guidance specifically includes ponds, wetter habitats and natural flood management among the work the programme can support. The opportunity is to develop a project that suits the land and delivers lasting benefits, rather than excavate a pond simply because funding may be available.

Funding information checked on 13 November 2026. Eligibility and available budget must be confirmed with the FiPL team.

What is Dartmoor FiPL funding?

FiPL supports one-off projects benefiting nature, climate, people or landscape. Dartmoor National Park Authority administers the local programme, with proposals assessed against local priorities. Projects are normally within the National Park, although work outside its boundary may qualify where it supports those priorities.

The national programme runs to March 2029, but that is not the deadline for every individual project. Dartmoor currently requires 2026–27 projects to be completed by 31 March 2027 and says it cannot fund multi-year projects. Confirm the applicable timetable before developing a programme of work. See Dartmoor’s FiPL guidance and contact details.

Does FiPL cover the whole cost?

Not automatically. National guidance allows up to 100% support where there is no commercial gain. Where a project benefits a business commercially, only a proportion may be funded. FiPL is competitive, and applications can close before the programme ends if funding is allocated.

Being in another environmental scheme does not necessarily rule a project out, but the same work cannot be funded twice. Some activities are subject to existing Countryside Stewardship rates rather than a contractor’s full quoted cost. Discuss the proposal with the protected landscape team before applying. Read the national FiPL rules.

Start with the site, not the excavator

Our starting point for a pond or wetland proposal is to understand the water, the existing habitats and how the land is used. A useful site discussion should consider:

A concept might involve restoring a pond, investigating shallow seasonal features or improving the way runoff is managed. These are options to assess, not a standard package to install on every farm. Existing wet ground should not be treated as empty space waiting to be dug.

For runoff-led projects, see our approach to natural flood management in Devon and Cornwall.

Turn a good idea into a deliverable proposal

Dartmoor’s 2026 applicant checklist asks for an illustrated project map, photographs of the site before work, costs and supporting evidence. Items over £5,000 require three comparative quotes. Relevant permissions and written landowner consent must also be addressed where required.

For construction work, useful quotations need more than “create a pond”. We recommend agreeing the intended footprint, approach to water retention, excavation and spoil handling, access, finishing and aftercare. Clear assumptions help everyone compare like with like and avoid discovering a substantial extra cost once machinery arrives.

Keep unresolved matters visible in the proposal. An unknown water source, difficult access or a consent still to be established is a reason to investigate, not something to hide in a low headline price.

How SAS Aquatics can help

We work with rural landowners on wildlife ponds and habitat projects across Devon and Cornwall. We can help assess practical opportunities, develop a clear scope and costed proposal, and deliver agreed pond, wetland and habitat works alongside advisers and specialists where needed.

A site assessment considers the immediate project and opportunities for habitat improvements across the wider site. Its written follow-up sets out findings, recommendations, priorities and next steps, with budget guidance where appropriate. Detailed design and specialist surveys are separate where required.

For a potential FiPL project, start with an enquiry to Dartmoor’s team at fipl@dartmoor.gov.uk. For practical site advice and delivery, email info@sasaquatics.com with the location, photographs and a short outline of what you would like to achieve.

SAS Aquatics is an independent contractor, not the grant administrator. Funding approval rests with the scheme. Confirm the agreement, permissions and authorised start date before committing to work.