Hardington Moor: Pond and Seasonal Wetland Creation
Natural England · Somerset · November 2026
From a wet hollow to a connected series of habitat features
At Hardington Moor National Nature Reserve, we combined on-site assessment and terrain analysis with practical earthworks to create a pond trial, shallow scrape and seasonal wetland cells.
Client
Natural England
Our role
Site assessment, terrain analysis and habitat earthworks
Stage
Agreed earthworks complete; seasonal water response to be monitored
A scheme shaped by the site
The original brief focused on a small pond in a damp, overgrown hollow. Our August assessment identified scope to work with the wider wet area rather than treat the pond as an isolated feature.
We considered the potential spring or runnel, surface runoff and the route water could take through the site. LiDAR terrain analysis helped guide that investigation and identify opportunities for shallow pools and seasonal wetland.
The approach was deliberately phased: carry out the agreed earthworks, then use the site’s response to rainfall to inform any further development.

The wider habitat context
The pond and seasonal features sit within a wider landscape of meadow, scrub and farmland. This provisional interpretation helps explain that setting without treating unverified habitat classifications as survey findings.

What we created
The completed first phase brought together a main pond excavation and additional seasonal features along the upper drainage route:
- Main pond trial: approximately 6.5 × 5.5 m, excavated to around 0.7 m.
- Seasonal channel: a 15 m route with three shallow cells to introduce variation along the drainage line.
- Shallow scrape: approximately 5 × 3.5 m and 0.45 m deep.
Excavated soils were reused on site, with banks graded into the surrounding ground. A spindle tree was also transplanted. These dimensions describe the earthworks recorded in November, not standing water depths.



Responding to ground conditions
Excavation revealed organic-rich topsoil that was drier than the earlier damp conditions suggested. Clay was present at varying depths, but there was not enough suitable material to form a reliable clay seal.
We removed as much topsoil as practicable from the aquatic area and recorded the ground conditions. That evidence is important: the shape of a pond alone cannot establish how consistently it will hold water.